In the village of Korkuteli, 7 km of water pipes are being renewed: the Mesarya Municipality promises reliable water supply

The Mesarya Municipality has announced the launch of a major infrastructure project to upgrade the water supply system in the village of Korkuteli. As part of the works, about 7 km of old pipes will be replaced to make the water supply healthier, safer and uninterrupted. The project includes modernising the network in line with contemporary technical standards, reducing breakdowns on old lines and decreasing water losses.
Mesarya Mayor Ahmet Latif called the project “a concrete confirmation of the promises made to residents” and stressed that the municipality intends to consistently strengthen basic infrastructure in rural areas.
At the same time, improvement works continue in Aslanköy around the wedding hall: renovation, landscaping and upgrading of the surrounding area are underway. The municipality notes that the aim of these projects is not only to improve the quality of public services but also to make public spaces more modern and comfortable for residents and visitors.
You may also be interested in:
- It will get colder by 4 degrees in Northern Cyprus; on Friday — rain and strong wind.
- The Dipkarpaz–Zaferburnu road will be closed on weekdays from 14:00 to 20:00 until 31 December.
- From Egypt to the world: scientists find out how cats actually became domestic animals
- The Turkish Cypriot Physiotherapists Association congratulated Sıla Uçar İncirli on being elected as head of the CTP
- Disease season in Cyprus: the president’s health adviser warns and lists protection measures

